PT Turbo has been rebuilding turbochargers since 1978. The process we use today is the result of 45+ years of refinement, equipment investment, and hands-on experience with tens of thousands of units. Here is what actually happens when a turbocharger comes through our shop.
Step 1: Teardown and Initial Assessment
Every turbocharger that arrives—whether a customer’s core for rebuild or an exchange core—is completely disassembled by a trained technician. All components are separated and laid out for inspection. At this stage we assess the overall condition and identify the failure mode. This assessment determines whether the core is rebuildable and what parts will be needed.
Step 2: Hot Wash and Cleaning
All metal components—housings, center section, shaft, wheels—are cleaned in our industrial hot wash system to remove carbon deposits, oil residue, and contamination. The turbine housing, which operates at the highest temperatures, requires the most thorough cleaning to expose any heat cracks or erosion that was hidden by deposits.
Step 3: Dimensional Inspection
After cleaning, each component is inspected for dimensional compliance with OEM specifications:
- Bearing bore diameter and surface finish
- Shaft diameter and straightness
- Thrust face geometry
- Compressor and turbine housing clearances
- Turbine and compressor wheel blade integrity
Components outside of specification are flagged for replacement. We do not reuse parts that do not meet spec.
Step 4: Parts Replacement
Bearings, thrust components, and piston ring seals are replaced on every rebuild regardless of apparent condition. We use OEM-specification or OEM-equivalent parts—not offshore generic components. For VGT units, the vane assembly and actuator are inspected and replaced if worn beyond specification.
Step 5: VSR Dynamic Balancing
After the new bearings and seals are installed, the rotating assembly is mounted on our VSR (Vibration Sort and Report) balancing machine. The assembly is spun at representative speeds in aerostatic (frictionless air) bearings while precision sensors measure vibration in multiple planes. Material is removed from the wheel or shaft hub until the assembly is within the OEM balance specification—typically less than 0.5 gram-inch per plane.
This is the step that most distinguishes professional rebuilds from inferior alternatives. An unbalanced rotating assembly destroys new bearings within hours.
Step 6: Final Assembly and Testing
The balanced rotating assembly is assembled into the clean housings with new seals. The completed turbocharger is inspected for correct clearances, free shaft rotation, and absence of wheel contact. VGT units are tested for actuator range of motion and response.
Ready to send your turbo in or need an exchange unit? Call (909) 824-1020 to discuss your application or visit our store. Contact PT Turbo here.
Shop PT Turbo: Browse our turbocharger rebuild kit catalog and our remanufactured turbocharger catalog — OEM-spec replacements with a 12-month, unlimited-mile warranty. In-stock units available for same-day shipping.
Further Reading
- OEM vs Remanufactured Turbocharger: Which Is Better?
- Turbocharger Balancing Explained: Why It Matters
- Turbocharger Rebuild vs Replace: What’s the Right Call?
- How to Break In a Rebuilt Turbocharger the Right Way
- 7 Root Causes of Turbocharger Failure in Diesel Engines
Further reading: Learn more about turbocharger technology.
Need a Turbocharger?
PT Turbo has rebuilt and sold turbochargers since 1978. We stock remanufactured units for Cummins, Duramax, Power Stroke, Detroit Diesel, and more — backed by a 12-month unlimited mileage warranty and same-week shipping from San Bernardino, CA.
📞 (909) 824-1020 · 346 S I St. #3, San Bernardino, CA 92410 · [email protected]